Apart from specific machines delivered by WTW Engineering, we also supply complete industrial installations or components for such installations.
For power engineering and cement plants:
-
ZOLLING (Germany) (E-ON) power plant: installation for unloading, storage and transport of biomass and feeding it into a boiler: silo unloading 270 m3/h, silo unloading volume 10,000 m3, Handed over for operation in 2002.
-
LANDESBERGEN (Germany) (E-ON): power plant: installation for unloading, storage and transport of biomass and feeding it into a boiler: silo unloading 270 m3/h, silo unloading volume 10,000 m3. Handed over for operation in 2003.
-
EMDEN (Germany) (E-ON): power plant: installation for unloading, storage and transport of biomass and feeding it into a boiler: silo unloading 270 m3/h, silo unloading volume 10,000 m3. Handed over for operation in 2003.
-
PĄTNÓW II POWER PLANT (PAK) power plant: wet slag removal installation for a 460-MW power unit, slag transport capacity 35 t/h, slag buffer tank 100 m3, loading into trucks at 70 t/h,
Handed over for operation in 2005.
-
LAGAN CEMENT (Ireland) cement plant: storage, unloading and transport installation for alternative fuels, unloading capacity 140 t/h.
Handed over for operation in 2006.
-
STALOWA WOLA POWER PLANT (TAURON) power plant: biomass unloading, storage and transport installation (chips and pellets), unloading capacity 50 t/h.
Handed over for operation in 2006.
-
EC BIAŁYSTOK power plant: biomass (chips) unloading, storage and transport installation, unloading capacity 315 m3/h, tanks capacity 2 × 5,000 m3.
Handed over for operation in 2008.
-
PĄTNÓW II POWER PLANT (PAK) power plant: ash removal installation for a 460-MW power unit, hot ash transport capacity 20 t/h.
Handed over for operation in 2010, later developed in 2013 and 2014 (installation with pneumatic transportation).
-
EC WROCŁAW power plant: chain conveyors and sweeping augers for biomass (pellets) unloading, storage and transport installation; transportation capacity of chain conveyors 200 t/h and 100 t/h, silos discharge capacity 100 t/h; silos volume 3 x 1600 m3.
Handed over for operation in 2010.
-
UNILAND (Spain) cement plant: biomass (alternative fuels, sawdust) unloading, storage and transport installation, unloading capacity 150 m3/h.
Handed over for operation in 2011.
-
TURÓW POWER PLANT: power plant: wet slag removal installation for a 460-MW power unit, slag transport capacity 80 t/h, slag buffer tank 700 m3, loading into trucks at 80 t/h.
Handed over for operation in 2018.